IN Brief:
- The Ministry of Defence published a £340m Project TELUM contract award to Babcock Aerospace on 20 November 2026.
- The services cover aerobatic-capable light aircraft, qualified flying instructors, engineering, and ground support for several defence training streams.
- The main contract period is scheduled from 2030 to 2040, replacing existing light aircraft training arrangements.
The Ministry of Defence has awarded Babcock Aerospace Ltd a £340 million contract for Project TELUM, the successor service for light aircraft flying training. The award notice, published on 20 November 2026, covers aerobatic-capable powered aircraft, qualified flying instructors, ground training, engineering, and related support. It encompasses air experience flying for cadets and flying grading for the armed services. The published contract period begins on 31 March 2030, rather than immediately following the announcement.
The agreed contract price is £340 million excluding VAT and £408 million including VAT, according to the published award. Its stated term runs from 31 March 2030 to 31 March 2040, and the notice describes a direct award to Babcock Aerospace Ltd. An earlier procurement notice envisaged a possible extension to March 2045; this is not an exercised option under the November award. The £340 million covers a service arrangement over time and should not be presented as the purchase price of an identified aircraft fleet.
TELUM is intended to succeed the Light Aircraft Flying Task 2 service, or LAFT2. In a September 2025 parliamentary answer, the Ministry of Defence stated that LAFT2 was due to expire in March 2030 and that TELUM would cover its existing cadet, University Air Squadron, Royal Navy, Army, and additional flying training tasks. Aligning the end of the current service with the published 2030 start of the new contract is a procurement milestone, but the authority has not published a detailed site-by-site transition plan.
The requirement combines several different flying pathways. University Air Squadrons need a platform for elementary flying activity, while Ministry of Defence-sponsored cadets receive air experience flights. The Army uses flying grading, and the Royal Navy requires flying grading and streaming to inform progression into later training. These functions share a need for reliable light aircraft and qualified instructors but do not impose identical requirements on flight profiles, evaluation, or the timing of training events.
The procurement requires aerobatic-capable light powered training aircraft, but the November award does not identify a specific manufacturer, model, fleet size, or procurement method. Its scope is a supported flying service, not a disclosed airframe production order. Training tasks can involve different flight profiles and assessment standards, making aircraft availability, instructor qualifications, and airworthiness management relevant to delivery. Without the chosen configuration and utilisation plan, no reliable aircraft count or unit-cost estimate can be derived from the total contract value.
Qualified Flying Instructors form a critical part of the contracted capability, since the aircraft alone cannot deliver a training syllabus or flying assessment. Instructor availability affects the number of sorties that can be planned, the continuity of student supervision, and the consistency of evaluation. Ground instruction and scheduling also have to be aligned with aircraft readiness and weather conditions. The notice confirms the supply of qualified instructors but does not disclose instructor headcount, annual student throughput, or planned flying hours.
Aircraft engineering and other core support services are included at permanent sites across the UK. Maintenance arrangements must sustain airworthiness and fleet availability while accommodating scheduled inspections, component replacement, defect rectification, and the documentation needed for safe flight. The engineering workload depends on aircraft type, utilisation, and operating environment, none of which is quantified in the released summary. A services contract of this sort consequently covers both operational delivery and the support capability that makes flying possible, rather than a one-off transfer of equipment.
With the existing LAFT2 service expected to finish in March 2030, the transition must align aircraft, instructors, ground facilities, support arrangements, and the approvals needed to undertake flying training. The public award identifies the date for the successor contract but not the schedule of preparatory work or the division of responsibility between sites. Nor does it establish whether any current LAFT2 aircraft or personnel will move to TELUM. Those details require further disclosure by Babcock or the Ministry of Defence.
Because the price covers a decade of services, it incorporates more than the provision of airframes. Flying instructors, maintenance, engineering support, ground instruction, planning, and approved operating facilities are all part of maintaining a usable training capability. The published notice does not disaggregate expenditure by location, service stream, aircraft, or flying hour. Comparing the total with the purchase cost of training aircraft would therefore give a misleading measure of what the MoD is buying.
University Air Squadrons, air experience flying, and the Army and Royal Navy’s grading pathways share access to supported light aircraft but serve different purposes. Air experience introduces participants to powered flying, whereas grading and streaming contribute evidence for decisions about subsequent military training. The contract consolidates the provision of aircraft and associated support without specifying a single common syllabus or assessment framework. The requirement therefore combines an aviation engineering service with several separately managed training activities.
The contractual award sets a ten-year TELUM service period from 2030 to 2040. The selected aircraft type, fleet configuration, maintenance locations, instructor numbers, and detailed transition arrangements have not been made public in the award summary. Until those particulars are released, the confirmed industrial development is a long-term training and engineering services commitment to Babcock, rather than an immediate aircraft delivery or training rollout.



